A week has passed and we have been told that within the month (by the end of September) the house should be complete and will be handed over to us.
The mirrors have been installed in all the bathrooms as have the shower cubical's, the bathrooms are complete.
The staircase as it should be not painted green, just wood the way we intended it to be.
The space under the stairs will be utilised as extra storage space (suitcases, vacuum cleaner etc). We will need to get a carpenter to put the door in for us when they have replaced the plaster work.
Waiting for the stain on the stairs (Nordic Teak)
Now we (me) have to start thinking of drainage pipes in the back garden as the soil is quite heavy clay, without digging pipes into the soil to help drain garden it will just be a boggy mess. As its too late this year to plant the garden up I will spend a lot of the time digging a lot of organic material, gypsum, bone&blood into the soil to get it ready for the 2012 season.
Looks fantastic
ReplyDelete