Here is the upstairs layout (I know downstairs first would be normal, but we are upside down here). Only the master bedroom has certain owners. Giulio & Amelia still have to fight over rooms although we suspect Giulio will have the front bedroom (Bed 4) and Amelia the room at the top of the stairs (Bed 3) to keep an eye on Giulio's night time wanderings!
Well here is the down stairs layout of the house.
Done some measurements to check the size of the house base is correct.
It all seems in order (although the slab for the water tanks is too small)! Lets see how that works.
Frame complete (according to Porter Davis) our independent surveyor says different!
Not expecting much progress this week as its Easter (and the building industry has great unions) and therefore great holidays.
A few (minor, I hope) problems: Steel posts not bolted down, Brackets exceed 1800mm Max, Sheet flooring (second floor) nailed too far apart (should be 150mm actually 200 - 250mm).
Time to pay the frame (once the frame errors have been corrected).
The roof appears to be complete, we just need to pay an extra $670 dollars as the Roof Tiles we originally selected are no longer 'Class 1' so we need to pay the upgrade cost!
It all adds up......... Just got to keep out eyes open and not just believe everything they tell us.
Not expecting much progress this week as its Easter (and the building industry has great unions) and therefore great holidays.